Re: Satie

From: Ariel Goobar (ariel@physto.se)
Date: Sun Apr 21 2002 - 11:44:10 PDT

  • Next message: clidman: "Re: Satie"

    Hi,
    I tend to agree with both Chris and Isobel about the high risk
    of trying to do both targets at NIRI under the current conditions. It
    seems to me that it would be sensible to go for the brighter z=1.08
    target, S02-032, with ISAAC tonight and tomorrow.

    The 2 x z=0.5 guys for which we also got ISAAC time should be left
    for the May run, where we should be able to make better optical
    lightcurves.

    Ariel

    On Sun, 21 Apr 2002, clidman wrote:

    > Hi Isobel,
    > The ISAAC schedule has been fluid these past two weeks because of technical problems
    > with the instrument. The 21st an 22nd are service nights. The 23rd to 25th are reserved
    > for VLTI commissioning and the 26th is a technical night which might be switched to service.
    > The 27th to 30th are full service nights and the 1st to 3rd are service for the 1st half of the night.
    >
    > Cheers, Chris.
    >
    >
    > Isobel Hook wrote:
    >
    > > Hi all,
    > >
    > > OK well it sounds as though it may not be worth going for a host for
    > > Satie this NIRI run. If it turns out we dont get to use all our NIRI time
    > > this run then doing Satie in June is still a possibility (There is no NIRI
    > > time available in May).
    > >
    > > I quite agree with Chris that these observations can take a long time and
    > > we dont have much of a window. We are hoping to use essentially the whole
    > > of the upcoming NIRI run (4 nights) so if everything goes perfectly we'll
    > > get two targets. However banking on a NIRI run going perfectly is probably
    > > not all that sensible at this stage so maybe we should start one SN with
    > > ISAAC now.
    > >
    > > However I am confused about when ISAAC is availble.
    > > Chris wrote:
    > >
    > > > Because of this problem, ISAAC has been rescheduled to service until
    > > >the 18th.
    > > >The 19th is scheduled as technical and may become service. So there is a
    > > >small window
    > > >of opportunity to do one candidate now. Service observing restarts on the
    > > >23rd.
    > >
    > > So What is happening now (19-22nd)? Is that time available? Also is
    > > "service" time the same as queue, i.e. available to us or not? (Is Tony's
    > > plan on the web correct now? It shows VLTI commissioning 23,24,25).
    > >
    > > The disadvantage of using ISAAC now is that this would mean we have less
    > > ISAAC time next month, when we dont have NIRI time either. Obviously this
    > > needs to be decided pretty soon. How is this going to be finialised?
    > >
    > > Isobel.
    >

    -- 
    ___________________________________________________________________
    Ariel Goobar (ariel@physto.se)