> I made one additional change to visits 22 - 36 of proposal 9727. Specifying a
> between of April 1 - 4 means that it can actually only execute on April 1, 2,
> and 3. Not April 4. I've opened up the between to be BETWEEN 01-APR-2004 TO
> 05-APR-2004. This will allow the search visits to execute up until April 4,
> 23:59 hrs UT, as was originally agreed on.
>
> Bill
>
> >
> >
> > Very good. Thanks, Bill.
> >
> >On Mon, 8 Mar 2004, William Januszewski wrote:
> >
> >> Hi Rachel,
> >>
> >> The special requirement for singles, and specifying a spacific guide star
> pair,
> >> only needs to be place on the first exposure in a visit. Even if the visit
> was 5
> >> orbits long it would continue to use the star(s) specified assuming the guide
> >> star acqs were normal.
> >>
> >> Cheers,
> >> Bill
> >>
> >> >
> >> >Hi Bill,
> >> >
> >> > I've reviewed the Phase II you sent and all looks
> >> >good... although I did notice for the visits in which you've
> >> >specified single guide stars, that the F775W exposure
> >> >doesn't also contain this spec. Since it is the 2nd
> >> >exposure in the series (same pointing, orient, and occuring
> >> >during the same orbit) I assume it would be redundant to
> >> >respecify the guide star, and the same one will continue to
> >> >be used as long as it worked the first time. Is this
> >> >correct?
> >> >
> >> >Rachel
> >> >
> >> >---------- Forwarded message ----------
> >> >Date: Wed, 3 Mar 2004 12:19:49 -0800 (PST)
> >> >From: Rachel G. <gibbo@jimbean.lbl.gov>
> >> >Reply-To: Rachel G. <ragibbons@lbl.gov>
> >> >To: William Januszewski <williamj@stsci.edu>
> >> >Subject: Re: 9727, plan windows
> >> >
> >> >
> >> >Hi Bill,
> >> >
> >> > I will review the Phase II and get back to you in a
> >> >day or two.
> >> >
> >> >Many, many, thanks!
> >> >
> >> >Rachel
> >> >
> >> >On Wed, 3 Mar 2004, William Januszewski wrote:
> >> >
> >> >>
> >> >> Hi Rachel,
> >> >>
> >> >> Right after I sent the last email I noticed the plan windows for the
> visits
> >> had
> >> >> not been updated yet. All the visits are set to execute between April 1
> and 4
> >> >> even though the last email didn't look that way.
> >> >>
> >> >> Cheers,
> >> >> Bill
> >> >>
> >> >> PS, I've attached the latest version of the phase 2 that I have, so you
> have
> >> it
> >> >> now too. :)
> >> >>
> >> >
> >> >
> >> >
> >>
> >
>
This archive was generated by hypermail 2.1.4 : Wed Mar 10 2004 - 14:17:53 PST