From: clidman@eso.org
Date: Mon May 20 2002 - 02:18:51 PDT
Dear All,
Tonight on the VLT will be a mix of technical and service. The moon is
starting to become a factor.
Here is a proposed list of target priorities.
Candidate Grism OSF Integration
====================================================
S02-075(SDF5) Hex 300V/GG435 3600s (3x1200)
S02-058(Bard) Hex 300V/GG435 3600s (3x1200)
C02-013(Isntix) Box 300I/OG590 3600s (3x1200)
C02-033(Philantropix) C 300I/OG590 7200s (6x1200)
T02-059(Boromir) Box 300I/OG590 3600s (3x1200)
C02-032(ItNeedAFix) Hex 300I/OG590 7200s (6x1200)
T02-047(Butterbur) Hex 300V/GG435 3000s (3x1000)
The last one is listed separately as it as a high probability of getting done.
The first one is pending the confirmation of the offsets.
According to my calculations, we have 6 hours of observing time left. We will not
be able to do all the targets listed above.
Cheers, Chris.
This archive was generated by hypermail 2.1.4 : Sun May 19 2002 - 14:14:25 PDT